¡½300T/H x 85MW
¡@¡@P.T. Pabrik Kertas Tjiwi Kimia,
        Sby-Mojokerto,  Indonesia
¡@    TK-3 Cogeneration Plant,
    ¡@300T/H x 70MW

 

 

¡@¡@P.T. Pabrik Kertas Tjiwi Kimia, located in Mojokerto -- about an hour drive from Juanda international airport in Surabaya, East Java, is the biggest paper producer of copy paper, general paper and notebooks in  Indonesia.

        The 300T/H coal/oil fired boiler provides power at 70MW and process steam 120T/H required for the production expansion, which would have resulted in a great costs saving and a more reliable power supply.

         FHI, as a turn-key contractor and a whole-plant exporter, had overcome all difficulties and completed the project on schedule, making  this overseas turnkey project a total success. -- The TK-3 cogeneration plant started commercial operation in January, 1997.

P.T. PABRIK KERTAS TJIWI KIMIA, INDONESIA
TK-3 COGENERATION PLANT, 300T/H x 70MW 
   
¡½200T/H x 50MW ¡½300T/H x 85MW ¡½350T/H x 100MW
¡½500T/H x 150MW ¡½1950T/H x 600MW ¡½CFB 200T/H x 50MW
Copyrights ©2002 FORMOSA HEAVY INDUSTRIES CORP. All rights reserved.