¡@¡@Located in Chang-Hua city, FCFC Chang-Hua Plant produces Nylon fiber, Rayon fiber, textiles and detergents... etc. Although there're already a few existing cogeneration plants, this 350 T/H coal fired boiler unit was installed to met the increasing demand of steam and power due to the expansion of the process plants; meanwhile, this new unit would improve the power quality and operation flexibility.

The new cogeneration plant adds additional power capacity at 82,650KW and process steam at 127T/H to the existing system, and sells the extra power  to Taiwan Power corporation at favorable prices according to the rules of  the Cogeneration Regulation.

FHI took responsibilities for the main work of this 350 T/H Boiler unit, including the basic / detailed design, steel structure, pressure parts, coal pulverizer with gear unit... etc., and also led a team to conduct the commissioning. They completed  test-run in March, 1996 and started commercial running in May in the same year.

FORMOSA CHEMICAL & FIBER CORPORATION, CHANG-HUA G-7 COGENERATION PLANT,