Engineering Services: |
|
|
ĄD
|
Co-Generation System Evaluation |
|
ĄD
|
Co-Generation Plant Turn-key Project
and System Planning |
|
ĄD
|
Co-Generation Plant Operation Mode
Analysis |
|
ĄD
|
Investment Estimate and Feasibility
Study |
|
ĄD
|
Boiler Heat Transfer and Fluid
Dynamics Engineering |
|
ĄD
|
Basic Design and Detail Design
of Boiler and Auxiliary System |
|
ĄD
|
Construction, Equipment Installation
and Commission Running on Turn-key Base |
|
ĄD
|
Commission and Operation Staff
Training |
Control SystemĄG |
|
ĄD
|
Design with Distributed Digital
Control System for Power Plant's Central Control & Supervisory
|
|
ĄD
|
Automation & Coordination Design
Concept for Boiler/Turbine & Auxiliary up to PMS/EMS Capability |
|
Construction & CommissionĄG |
|
ĄD
|
Professional and experienced team
for construction and commission |
|
ĄD
|
Equipped with 800 MT/400 MT/350
MT cranes |
|
ĄD
|
Equipped with 200~2000 MT hydraulic
jack systems |
Main Products ItemsĄG |
|
ĄD
|
Utility Power Boiler
Coal/Oil Firing Supercritical, Capacity 1500T/Hr~3000T/Hr
|
|
ĄD
|
Industries Power Boiler
Coal/Oil Firing Subcritical, Capacity 100T/Hr~1000T/Hr |
|
ĄD
|
Fluidized Bed Boiler
Capacity 100T/Hr~1000T/Hr |
|
ĄD
|
Heat Recovery Steam Generator |
|
ĄD
|
Wind Turbine Generator
Capacity 250KW~3000KW |
|
ĄD
|
Cooling Tower
1000T/Hr~5000T/H per Cell |
|
ĄD
|
Surface Condenser |
|
ĄD
|
Coal Pulverizer
Grinding Capacity 7T/Hr~70 T/Hr |
| |
|