¡½200T/H x 50MW
¡@¡@NAN-YA PLASTICS CORPORATION (NPC)¡G
        JH-1COGENERATION PLANT AT TAOYUAN,
        200T/H x 56.7MW        

 

 

¡@¡@NPC produces LCD, PCB and semi-conductor goods at  Jin-Shin Plant in a suburb Taoyuan. This 200T/H coal fired boiler unit was installed due to the expansion of production lines and to meet the demand for a higher quality and more reliable power supply required by the processes  of the high-tech industry. 

         The extra power would be sold to Taiwan Power Corporation (TPC) at favorable prices according to the rules of  the Cogeneration Regulation.

        FHI took responsibilities for the main work of this 200 T/H Boiler unit, including the basic / detailed design, steel structure, pressure parts, coal pulverizer with gear unit... etc., and also led a team to conduct the commissioning. The JH-1 Cogeneration Plant has looped into the 161KV grid of TPC in June, 1997 and started commercial running in August in the same year.¡@¡@
¡@

NAN-YA PLASTICS CORP.
JH-1 COGENERATION PLANT, 200T/H x 56.7MW
   
¡½200T/H x 50MW ¡½300T/H x 85MW ¡½350T/H x 100MW
¡½500T/H x 150MW ¡½1950T/H x 600MW ¡½CFB 200T/H x 50MW