Machinery

Services

FPC Jen-Wu Flue Gas CO2 Capture and Carbon Fixation System Project(Construction in progress)

The system was manufactured in the fabrication shop by modularization , then the module transfer to site and erection.
Equipment 50ST, Steel structure 35MT, Piping 2,900DB, Electric wiring 4Km.