FPCC OL-1 H-131/H-141 Ethylene Cracking Furnace Project

Ethylene Capacity 770,000 -t/a., startup on November, 2002.
Quantity of Work:Concrete 1,225KL, Steel structure 885MT,
Piping 46,000DB, Equipment 236MT, Electric wiring 50Km, Refractory 4,200m2.
Foundation Pile Retest
Furnace Lifting
The steel structure is assembled before the ground and then lifted.
Steam Drum Lifting
SA516-70 x 1,592mm I.D x 104mm t x 15,250mm L x 80Ton x 2ST
SLE Lifting
23,480mm L x 3,362mm W x 18Ton x 16ST
Convection Furnace Tube Hardness Test
After the furnace tube is welded, except for 100% RT,
and for magnetic particle inspection,
to ensure the quality of the weld.
Instrument signal wave tube cable insulation resistance and continuity test.
Control valve adjustment and loop test.